On the move

Well move time has finally come. It has taken a lot of work, and we have worked through many delays and issues, but the first of the buildings is on the move. The blacksmith shop will the first building placed at the new site.

More photos here.

Saturday
Jun192010

Digging piers for the Hulen

Sunday
May302010

Redwood

As mentioned before, it is taking a little longer than expected to get things moving, but the project is still progressing. We expect the first moves to take place within a few weeks.

Along with the hundreds of artifacts that have been collected from the site (and will be on display in the Montgomery location), is a redwood cross-section. This piece details its long history through the growth rings.

 

Sunday
May092010

The first move...(updated)

Welll, it is taking a little longer than expected to start the moves, but we are getting close. The new pad sites are ready and the blacksmith shop and tree trunk are ready to go. 

Check out some of the photos of the blacksmith shop all packed up and ready to move. Photos.

 

 

Sunday
May092010

Crane cabin